Quality Control

Quality Assurance & Quality Control Procedures

Management Responsibility

It is our policy to provide services and goods, which meet the agreed contractual specifications and quality standards defined by the customer.

  1. To maintain a staff able to interpret, clarify and conform to the clients requirements
  2. To ensure, by proper selection and examination, that goods supplied and/or incorporated are suitable and safe to operate To make sure that the goods and systems are installed in a satisfactory manner
  3. To commission completed systems so that their operation and maintenance is facilitated I so required by the building owner, to ensure that the completed and commissioned systems are on a regular and systematic basis
  4. To observe the Quality Assurance Manual and Procedures and/or the QA plan agreed and specific to a project.
  5. To plan, control and document, in a systematic manner, those procedures necessary to provide the specified level of Quality Assurance
  6. To maintain such records as will substantiate the Quality Assurance applied throughout each project undertaken.

Introduction Method Chart

Contract Award

  1. Contract documentation
  2. Consultants Construction drawing specification

Procurement Shop Drawings

  1. Plant equipment • Co-ordinate working drawing
  2. Subcontract packages • Technical submission
  3. Labour & Materials

Quality Management

  1. Quality Plan
  2. Outline Method Statement

Construction Phase

  1. Method statement
  2. Safety plan / risk assessments
  3. Progress monitoring / control

Testing & Commissioning

  1. Method statement program
  2. Record drawings
  3. O & M Manuals and Handover documents

Head Office

Godown Area, A-block, Garib Nawaz Building, Dhatkidih, Jamshedpur Jharkhand 831001 India

Regional Office

Malad West, Mumbai, Maharashtra - 400095

Joomla! Debug Console

Session

Profile Information

Memory Usage

Database Queries